Case study: Plant relocation
Refrigeration Pack Relocation
A refrigeration pack removed from one site and reinstalled at another: fully piped, wired, recharged and back in operation.
- Type
- Plant relocation
- Completed
- February 2026
The challenge
A working refrigeration pack needed to move from one site to another and be brought back into service.
What we did
- Recovered the refrigerant and decommissioned the pack
- Removed the pack from the original site
- Reinstalled it at the new site
- Ran new pipework and electrical wiring
- Recharged and recommissioned the system
The result
The pack was fully piped, wired, recharged and back in operation at its new site. We're happy to reuse existing equipment, supply second-hand equipment or supply new, to suit each customer.